← Back to the Directory

Waboose Control Dam

Waboose Control Dam

The Waboose Control Dam is a key part of the Ogoki River Diversion Project. The project redirected part of the Ogoki River to drain into the Lake Superior Basin rather than the Hudson Bay watershed. This was done to maximize hydropower for the increased industrial activities of World War II. Amazingly, diversions of Canadian rivers from the Hudson Bay watershed raised the average height of Lake Superior by 2.1 centimeters.

About this dam

Built
1940-1943
Purpose
River Diversion
River
Ogoki River
Agency
Ontario Power Generation

Communities displaced by this dam (1)